# 3.6 Tailoring and Customisation
To ensure that the PM2 Methodology effectively **serves** an organisation’s and a project’s **needs**, some level of tailoring or/and [[Customisation]] may be required.
Tailoring refers to changing specific parts of the methodology, such as **process steps**, the **content of artefacts**, the distribution of **responsibilities** amongst the various roles, etc. Organisations do this to adapt the methodology to the specific needs of their structure and culture, and to align the methodology to organisational processes, policies, etc.
==Tailoring makes more sense at the organisation/departmental level==, but some tailoring can also take place **at the project level**, based, for instance, on the **complexity, size or type** of a project. In addition to any tailoring, further customisation may also be required at the project level to reflect the project’s specific management needs.
**Examples** of such customisations are the definition of **decision thresholds for escalation**, **risk tolerances** based on the risk appetite of the stakeholders, etc.
All tailoring and customisations should be **documented in the Project Handbook**.
The following **guidelines** should be considered when tailoring or customising the PM2 Methodology:
- First, **understand** the purpose and value of the methodology element to be tailored, and then proceed with its tailoring.
- **Avoid simplifying** the methodology by eliminating whole chunks (e.g. a phase, a role, an activity or an artefact), but **rather scale down (or up)** the scope of that element.
- **Balance** the level of control a project needs against the extra effort such control requires.
- **Eliminate waste** (lean approach) but remain aligned with the spirit of the PM2 Methodology as this is reflected by its four pillars and mindsets.
- Remember that the methodology was designed as an integrated whole, so **avoid unnecessary deviations**.